All Issue

2020 Vol.10, Issue 1 Preview Page

Research Article


March 2020. pp. 16-32
Abstract


References
1 
Acebes, F., Pajares, J., Galán, J., and López-Paredes, A., "A new approach for project control under uncertainty. Going back to the basics", International Journal of Project Management, vol. 32, no. 3, pp. 423-434, 2014.
10.1016/j.ijproman.2013.08.003
2 
Platje, A. and Seidel, H., "Breakthrough in multiproject management: how to escape the vicious circle of planning and control", International Journal of Project Management, vol. 11, no. 4, pp. 209-213, 1993.
10.1016/0263-7863(93)90037-N
3 
Besteiro, E., De Souza Pinto, J., and Novaski, O., "Success factors in project management", Business Management Dynamics, vol. 4, no. 9, pp. 19-34, 2015.
4 
Abdul-Rahman, Z. H., Berawi, M., Berawi, A., Mohamed, O., Othman, M.J.A., and Yahya, I., "Delay mitigation in the Malaysian construction industry", Journal of Construction Engineering and Management, vol. 132, no. 2, pp.125-133, 2006.
10.1061/(ASCE)0733-9364(2006)132:2(125)
5 
Chan, A., "Time-cost relationship of public sector projects in Malaysia", International Journal of Project Management, vol. 19, pp. 223-229, 2001.
10.1016/S0263-7863(99)00072-1
6 
White, D. and Fortune, J., "Current practice in project management - An empirical study", International Journal of Project Management, vol. 20, no. 1, pp. 1-11, 2002.
10.1016/S0263-7863(00)00029-6
7 
Winch, G. and Kelsey, J., "What do construction project planners do?", International Journal of Project Management, vol. 23, no. 2, pp. 141-149, 2005.
10.1016/j.ijproman.2004.06.002
8 
Zou, Y. and Lee, S., "The impacts of change management practices on project change cost performance", Construction Management and Economics, vol. 26, no. 4, pp. 387-393, 2008.
10.1080/01446190801918714
9 
Thompson, C. and Walker, B., "Basics of research (Part 12): Qualitative research," Air Medical Journal, vol. 17, pp. 65-70, 1998.
10.1016/S1067-991X(98)90022-0
10 
Chang, A., "Reasons for cost and schedule increase for engineering design projects", Journal of Management in Engineering, vol. 18, pp. 29-36, 2002.
10.1061/(ASCE)0742-597X(2002)18:1(29)
11 
Iyer, K. and Jha, K., "Factors Affecting Cost Performance Evidence from Indian Construction Projects", International Journal of Project Management, vol. 23, pp. 283-295, 2005.
10.1016/j.ijproman.2004.10.003
12 
Larsen, J., Shen, G., Lindhard, S., and Brunoe, T., "Factors affecting schedule delay, cost overrun, and quality level in public construction projects", Journal of Management in Engineering, vol. 32, no. 1 pp. 04015032, 2016.
10.1061/(ASCE)ME.1943-5479.0000391
13 
Aibinu, A. and Jagboro, G., "The effects of construction delays on project delivery in Nigerian construction industry," International Journal of Project Management, vol. 20, pp. 593-599, 2002.
10.1016/S0263-7863(02)00028-5
14 
Yong, Y. and Mustaffa, N., "Critical success factors for Malaysian construction projects: an empirical assessment", Construction Management and Economics, vol. 31, no. 9, pp. 959-978, 2013.
10.1080/01446193.2013.828843
15 
Akintoye, A., Fitzgerald, E. "A survey of current cost estimating practices in the UK", Construction Management and Economics, vol. 18, no. 2, pp. 161-172, 2000.
10.1080/014461900370799
16 
Barraza, G. and Bueno, R., "Probabilistic control of project performance using control limit curves", Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 957-965, 2007.
10.1061/(ASCE)0733-9364(2007)133:12(957)
17 
Chan, P., Ho, D., and Tam, C., (2001) "Design and build project success: multivariate analysis", Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100, 2001.
10.1061/(ASCE)0733-9364(2001)127:2(93)
18 
Cho, K., Hong, T., and Hyun, C., (2010) "Integrated schedule and cost model for repetitive construction process", Journal of Management in Engineering, vol. 26, no. 2, pp. 78-88, 2010.
10.1061/(ASCE)ME.1943-5479.0000009
19 
Flyvbjerg, B., Holm, M., and Buhl, S., "How common and how large are cost overruns in transport infrastructure projects?" Transport Reviews, vol. 23, no. 3, pp. 71-88, 2003.
10.1080/01441640309904
20 
Gibson, G., Wang, Y., Cho, C., and Pappas, M., (2006) "What is preproject planning anyway?" Journal of Management in Engineering, vol. 22, no. 1, pp. 35-42, 2006.
10.1061/(ASCE)0742-597X(2006)22:1(35)
21 
Jung, Y. and Woo, S., "Flexible work breakdown structure for integrated cost and schedule control", Journal of Construction Engineering and Management, vol. 130, no. 5, pp. 616-625, 2004.
10.1061/(ASCE)0733-9364(2004)130:5(616)
22 
Kim, S. and Liu, L. "Cost information models for managing multiple projects". Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 966-974, 2007.
10.1061/(ASCE)0733-9364(2007)133:12(966)
23 
Koga, Y., Chua, D., Loh, P. and Jaselskis, E., "Key determinants for construction schedule performance", International Journal of Project Management, vol. 17, no. 6, pp. 351-359, 1999.
10.1016/S0263-7863(98)00058-1
24 
Larson, E., "Project partnering: Results of study of 280 construction projects", Journal of Management in Engineering, vol. 11, no. 2, pp. 30-35, 1995.
10.1061/(ASCE)0742-597X(1995)11:2(30)
25 
Laufer, A. and Tucker, R., "Is construction project planning really doing its job? A critical examination of focus, role and process", Construction Management and Economics, vol. 5, no. 3, pp. 243-266, 1987.
10.1080/01446198700000023
26 
Lee, S., Thomas, S., Tucker, R., "The relative impacts of selected practices on project cost and schedule", Construction Management and Economics, vol. 23, no. 5, pp. 545-553, 2005.
10.1080/01446190500040232
27 
Leu, S., Chen, A., and Yang, C., "A GA-based fuzzy optimal model for construction time-cost trade-off" International Journal of Project Management, vol. 19, pp. 47-58, 2001.
10.1016/S0263-7863(99)00035-6
28 
Kanwal, N., Zafar, M., Bashir, S., (2017), "The combined effects of managerial control, resource commitment, and top management support on the successful delivery of information systems projects", vol. 35, pp. 1459-1465, 2017.
10.1016/j.ijproman.2017.08.007
29 
Sanchez, Otávio Próspero, Terlizzi, Marco Alexandre, Cesar de Moraes, Heverton Roberto de Oliveira (2017) Cost and time project management success factors for information systems development projects, IJPM (35), 1608-1626.
10.1016/j.ijproman.2017.09.007
30 
Young, R. and Poon, S., "Top management support-almost always necessary and sometimes sufficient for success: Findings from a fuzzy set analysis" International Journal of Project Management, vol. 31, pp. 94-957, 2013.
10.1016/j.ijproman.2012.11.013
31 
Bryde, D., Unterhitzenberger, C., and Jober, R., "Conditions of success for earned value analysis in projects, International Journal of Project Management, vol. 36, pp. 474-484, 2018.
10.1016/j.ijproman.2017.12.002
32 
Ling, F., "How project managers can better control the performance of design-build projects", International Journal of Project Management, vol. 22, no. 6, pp. 477-488, 2004.
10.1016/j.ijproman.2003.09.003
33 
Ling, Y., Low, S., Wang, S., and Lim, H., "Key project management practices affecting Singaporean firms' project performance in China", International Journal of Project Management, vol. 27, no. 1, pp. 59-71, 2009.
10.1016/j.ijproman.2007.10.004
34 
Marco, A., Briccallero, D., Rafele, C., "Cost and schedule monitoring of industrial building projects: Case study", Journal of Construction Engineering and Management, vol. 135, no. 9, pp. 853-862, 2009.
10.1061/(ASCE)CO.1943-7862.0000055
35 
Milosevic, D. and Patanakul, P., "Standardised project management may increase development projects success" International Journal of Project Management, vol. 23, no. 3, pp. 181-192, 2005.
10.1016/j.ijproman.2004.11.002
36 
Ritchie, L. and Spencer, W. O'Connor, "Carrying out qualitative analysis", in: Qualitative research practice: A guide for social science students and researchers, Eds, J. Ritchie, J. Lewis, SAGE publications, London, pp. 219-262, 2003.
37 
Olawale, Y. and Sun, M., "PCIM: Project Control and Inhibiting Factors Management Model", Journal of Management in Engineering, vol. 29, no. 1, pp. 60-70, 2013.
10.1061/(ASCE)ME.1943-5479.0000125
38 
Olawale, Y. and Sun, M., (2015) "Construction project control in the UK: Current practice, existing problems and recommendations for future improvements", International Journal of Project Management, vol, 33 no. 3, pp. 623-637, 2015.
10.1016/j.ijproman.2014.10.003
Information
  • Publisher :Korea Institute of Construction Engineering and Management
  • Publisher(Ko) :한국건설관리학회
  • Journal Title :Journal of Construction Engineering and Project Management
  • Volume : 10
  • No :1
  • Pages :16-32
  • Received Date :2018. 09. 29
  • Accepted Date : 2019. 12. 09
Journal Informaiton Journal of Construction Engineering and Project Management Journal of Construction Engineering and Project Management
  • NRF
  • KOFST
  • crosscheck
  • open access
  • orcid
  • KISTI Cited-by
  • KISTI Current Status
  • ccl
Journal Informaiton Journal Informaiton - close