All Issue

2019 Vol.9, Issue 2

June 2019. pp. 1-24
Abstract


References
1 

Abd El-Razek, M. (2008). Causes of Delay in Building Construction Projects In Egypt. Journal of Construction Engineering & Management, 134(11),831-841.

10.1061/(ASCE)0733-9364(2008)134:11(831)
2 

Adwera, L.A. (1991), Construction and Project Management Practices in Kenya, An Exploratory Study. Unpublished BA Project, Department of Building Economics and Management, University of Nairobi-Kenya.

3 

Abwunza, A.A. (2006), Identification of cost risk factors in building contracts in Kenya. Unpublished M.A Thesis. University of Nairobi.

4 

Atieno, S.O. (2016), Factors affecting performance of road construction projects in arid and semi-arid areas in Kenya. International Journal of Social Sciences and Information Technology. Vol II Issue VIII, ISSN 2412-0294.

5 

Aduma, L.K. & Kimutai, G. (2018). Project risk management strategies and project performance at the National Hospital Insurance Fund in Kenya. International Academic Journal of Information Sciences and Project Management, 3(2), 111-136.

6 

Akintoye, A. (2007). Collaborative relationships in construction-The UK contractor's perception. Engineering, Construction and Architectural Management.

10.1108/09699980710829049
7 

Atkinson, R. (1999). Project management: Cost,time and quality,two best guesses and a phenomena.its time to accept other success criteria. International Journal of Project Management, Vol 17,Issue 6 December, 1999, Pages 337-342.

10.1016/S0263-7863(98)00069-6
8 

Azhar, N. (2008). Cost Overrun Factors in the Construction Industry of Pakistan. 1st International Conference on Construction in Developing Countries. Karachi.: Advancing & Integrating Construction Education,Research and Practice.

9 

Bryman (2012). Social Research methods 4th edition. New York: Oxford University Press Inc

10 

Chandara, P. (2002). Projects Planning,Financing,Implementation and Review. Tata: McGraw-Hill Publishing Company.

11 

Chitkara, K. (2002). Construction Project Management Planning,Scheduling and Control. Hill Publishing Company Ltd.

12 

Christenson, D. (2008). Using vision as a critical Success element in Project Management. International Journal of Project Management.

10.1108/17538370810906291
13 

Cooke, B.W. (2004). Construction Planning Programming and Control. Oxford: Blackwell Publishing.

14 

Cooke-Davies, T. (2002). "The real success factors on projects. International Journal of Project Management.

10.1016/S0263-7863(01)00067-9
15 

Creswell, J. (2009). Research Design: Qualitative,quantittative,and mixed methods approach.3rd Edition. Thousands Oak,CA: SAGE Publications.

16 

Egbu, C. (1998). "Planning and Control processes and techinques for refurbishment management". Construction Management and Economics, 16(3),315-325.

10.1080/014461998372349
17 

Fortune, J. (2006). Framing of critical success factors by a systems model. International Journal of Project Management,Elsevier Science Ltd and IPMA.

10.1016/j.ijproman.2005.07.004
18 

Frimpong, Y. (2003). Delay and cost overruns in Construction of Ground water Projects in developing countries. International Journal of Project Management, 21,321-326.

10.1016/S0263-7863(02)00055-8
19 

George, R. (2008). Critical activities in front End planning process. Journal of Management of Engineering.

10.1061/(ASCE)0742-597X(2008)24:2(66)
20 

Gichunge, H. (2000). Risk management in the Building Industry in Kenya. Unpublished PHD.Thesis.University of Nairobi.

21 

Goodman, L. (1988). Project Planning and Management-an integrated system for improving productivity. New York: Van Nostrand Reinhold Company Inc.

10.1007/978-1-4684-6587-7
22 

Government of Kenya (2003), Constituencies Development Fund Act 2003: Government Printers, Nairobi.

23 

Greer, M. (1999). Handbook of Human performance Technology. San Francisco: Jossey-Bas.

24 

Gwaya, A. (2014). Development of appropriate project management factors for the construction industry in Kenya. International Journal of Soft Computing and Engineering (IJSCE), ISSN:2231-2307,Vol 4,Issue 1.

25 

Gwaya, A.O. (2015). Development of a project management evaluation model for the construction industry in Kenya. Nairobi: Published PhD Thesis, JKUAT.

26 

Hendrickson (1999). Causes of Delay in Construction. Journal of Construction Engineering and Management, Vol 134,issue 11,p831.

27 

Iyer, K. J. (2005). Factors affecting cost performance evidence from indian construction projects. International journal of project management, 23 (4),283-295.

10.1016/j.ijproman.2004.10.003
28 

Kagiri, N. (2005). Time and Cost overrun in Power projects in Kenya: A case study of Kenya Electricity Generating Company Ltd. Unpublished MBA Thesis.University of Nairobi.

29 

Khang'ati, A. (1986), The implementation of Public Building Projects. A case study of Ministry of Public works. Housing and Physical planning. Unpublished MA Thesis, University of Nairobi

30 

Kithinji, N. B, (1988), Systems approach to Building Project Management: Experiences from Kenya. Unpublished M.A Thesis, University of Nairobi

31 

Kivaa, T. (2000), developing a model for estimating construction period: A survey of Building projects in Nairobi. Unpublished M.A Thesis, University of Nairobi.

32 

Kimani, S.M. (2006), An investigation into the role of planning in managing delays in construction projects. Unpublished M.A Thesis. University of Nairobi.

33 

Kaming, P. (1997). Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia. Journal of Construction Management and Economics, 7,83-94.

10.1080/014461997373132
34 

Kenya National Bureau of Statistics (KNBS) 2018: Economic Survey, 2018: Government Printers, Nairobi

35 

Kerzner, H. (2006). Project Management: A systems Approach to Planning,Scheduling and Controlling 9th Edition. John Wiley & Sons publications.

36 

Kongere, N. S. (2010). Project Management,From Design to Implementation. Nairobi: Richmond Designers and Printers.

37 

Lindahl, G. (2007). Client's goals and the Construction Project Management Process. Journal of Construction Management and Economics.

38 

Masu, S. (2006). An investigation into the causes and impact of resource mix practices in the performance of construction firms in Kenya. Nairobi: Unpublished Phd.Thesis.University of Nairobi.

39 

Mapesa B.M.; and Kibua N.T (2006). IPAR Discussion Paper No. 076/2005. As Assessment of the Management andUtilization of the Constituency Development Fund In Kenya

40 

Morris, S. (1990). Cost and Time Overruns in Public Sector Projects.

41 

Mbugua, S.J. (1979) "Building Contracts and Implementation" A paper presented at a Top Workshop (Out span Hotel Nycri - Kenya),

42 

Mbaya, J.S (1984) "The Management of Public Sector Construction Projects in Kenya: A Systems and Contigency Approach", (M.Sc. ARCH. Project, University of London ).

43 

Muchungu, P. (2012). The contribution of human factors in the performance of construction projects in kenya. Nairobi: Unpublished Phd.Thesis.University of Nairobi.

44 

Munano, A. (2012). Pre-constrcution Planning: Exploring the factors that influence timelines of project completion for public sectors buildings in Kenya. Unpublished Master of Construction Management Thesis.Jomo Kenyatta University.

45 

Mureithi, S.K. (2006), The role of procurement method in project performance, a comparative study between traditional and alternative methods. Unpublished M.A Thesis. University of Nairobi.

46 

Musa, G. (1999). Determination of Factors Influencing Projects Delays in Water Projects in Kenya: The case of Government Funded Projects. Nairobi: Unpublished MBA Thesis University of Nairobi.

47 

Mwandali, D. (1996). Analysis of Major Factors that affect Projects Management: A Case of Kenya Railways Projects. Nairobi: Unpublished MBA Thesis,University of Nairobi.

48 

Mwangi, C.M. (1988), Safety Management on Construction Sites in Kenya, Unpublished MA Thesis, University of Nairobi.

49 

Mbatha, C.M. (1986), Building Contract Performance, A case study of Government Projects, Kenya, Unpublished MA Thesis, University of Nairobi.

50 

Mbatha, C.M. (1993), The management of Building Projects, Analysis of Building Procurement Systems, Features and Conception of an appropriate project management system for Kenya, PhD Thesis, Wuppertal University, Germany.

51 

Mbeche, I.M. and Mwandali, D.N. (1996), Management by projects, a paper presented at the regional conference on construction project management, 20th- 23rd November, Garden Hotel, Machakos.

52 

Mbawi. G.O. & Muchelule, Y. (2015): Factors influencing project performance among Kenyan universities in Kisumu County: International Journal of Innovative Social Sciences & Humanities Research 3(3): 1-12, July-Sept 2015: ISSN: 2354-2926.

53 

Memon et al. (2012): Time and Cost performance in construction projects in Southern and Central Pensular Malaysia. International Journal of Advances in Applied Sciences.

10.11591/ijaas.v1i1.537
54 

Muiruri G. and Mulinge C. (2014): Health and Safety Management on Construction Project sites in Kenya. FIG Congress 2014: Engaging the Challenges- Enhancing relevance. Kualar Lumpur, Malaysia, 16-21 June, 2014.

55 

Nguyen, A. (2004). A study on Project success factors in large construction projects in Vietnam.

56 

Olawale, Y.A. (2010). "Cost and time control of construction projects: Inhibitng factors and mitigating measures in practice". Construction Management and Economics, 28 (5),509-526.

10.1080/01446191003674519
57 

Ofori, G. (2000) Globalization and construction industry development: research opportunities. Construction Management and Economics, 18, 257-262.

10.1080/014461900370627
58 

Pellicer, E. (2005). Cost control in Consulting engineering firms. Journal of Management in Engineering, 21 (4),189-192.

10.1061/(ASCE)0742-597X(2005)21:4(189)
59 

Project Management Institute (2016), Project Management Body of Knowledge (5th Edition) PMI Publications, New York

60 

Republic of Kenya, Development Plan 1970-1974.(Nairobi: Government Printer 1969), p.349.

61 

Republic of Kenya, "Buildings Operations and Organization Manual" Ministry of Works,Housing and Physical Planning (Nairobi: 1974).

62 

Syagga, P.M., (1985), The Impact of Building Design on Manteinance costs fo residential housing estates owned by Mombasa Municipal Council. Unpublished PhD Thesis, Department of Land Development, University of Nairobi.

63 

Seboru. M.A., (2006), An investigation into factors causing delays in road construction projects in Kenya. Unpublished M.A Thesis. University of Nairobi.

64 

Talukhaba, A. (1999). An investigation into factors causing construction project delays in Kenya. Nairobi: Unpublished PhD.Thesis,University of Nairobi-Kenya.

65 

Turner and Townsend (2018): International Construction Market Survey 2018 Report: www.turnerandtownsend.com.

66 

Wanyona, G. (2005). Risk Managment in the cost planning and control of building projects.The case of quantity Surveying profession in Kenya. Unpublished PhD Thesis.University of Cape Town.

67 

Walliman, N. (2011). Research Project: 3rd Edition. London: SAGE Publications Ltd.

68 

Waihenya, J.W (2011). Identifying causes of cost overruns in Non-traditional contracts in Kenya. Unpublished M.A Thesis. University of Nairobi.

69 

Yakubu, O.A. (2009). Cost and time control of construction projects: A survey of Contractors and Consultants. Construction Information Quarterly, 11(2),53-5

Information
  • Publisher :Korea Institute of Construction Engineering and Management
  • Publisher(Ko) :한국건설관리학회
  • Journal Title :Journal of Construction Engineering and Project Management
  • Journal Title(Ko) :None
  • Volume : 9
  • No :2
  • Pages :1-24
  • Received Date :2019. 01. 22
  • Revised Date :2019. 05. 02
  • Accepted Date : 2019. 05. 20
Journal Informaiton Journal of Construction Engineering and Project Management Journal of Construction Engineering and Project Management
  • NRF
  • KOFST
  • crosscheck
  • open access
  • orcid
  • KISTI Cited-by
  • KISTI Current Status
  • ccl
Journal Informaiton Journal Informaiton - close