HOME  /  SEARCH  /  LOG IN  /  SIGN UP
JCEPM Vol.1 (2011)
Vol.1 No.1 (May 2011)
Vol.1 No.2 (Aug 2011)
Vol.1 No.3 (Dec 2011)
JCEPM Vol.2 (2012)
Vol.2 No.1 (Mar 2012)
Vol.2 No.2 (Jun 2012)
Vol.2 No.3 (Sep 2012)
Vol.2 No.4 (Dec 2012)
JCEPM Vol.3 (2013)
Vol.3 No.1 (Mar 2013)*
Vol.3 No.2 (Jun 2013)
Vol.3 No.3 (Sep 2013)*
Vol.3 No.4 (Dec 2013)
JCEPM Vol.4 (2014)
Vol.4 No.1 (Mar 2014)
Vol.4 No.2 (Jun 2014)
Vol.4 No.3 (Sep 2014)
Vol.4 No.4 (Dec 2014)
JCEPM Vol.5 (2015)
Vol.5 No.1 (Mar 2015)
Vol.5 No.2 (Jun 2015)
Vol.5 No.3 (Sep 2015)
Vol.5 No.4 (Dec 2015)*
JECPM Vol.6 (2016)
Vol.6 No.1 (Mar 2016)
Vol.6 No.2 (Jun 2016)
Vol.6 No.3 (Sep 2016)
Vol.6 No.4 (Dec 2016)
JECPM Vol.7 (2017)
Vol.7 No.1 (Mar 2017)
Vol.7 No.2 (Jun 2017)
Vol.7 No.3 (Sep 2017)
Vol.7 No.4 (Dec 2017)
 Home > Publications > JCEPM Vol.5 (2015) > Vol.5 No.1 (Mar 2015)

  Journal of Construction Engineering and Project Management

1. Journal of Construction Engineering and Project Management 2015/04/30 
2. Measuring Performance to Engage the Extended Project Team in Construction 2015/04/30 
3. Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization 2015/04/30 
4. Assessing the Impacts of Project Interfaces in Construction Works in Nigeria 2015/04/30 
5. Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks 2015/04/30 
6. Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management 2015/04/30 
7. The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique 2015/04/30 
Jump to:  
 


Room 1102, The Korea Science and Technology Center, New Building, 635-4, Yoksam, Kangnam, Seoul, Korea 135-703
Tel. +82-2-556-5184~6 / Fax. +82-2-556-2408 / E-mail. jcepm@kicem.or.kr
Supported by ONTOIN