HOME  /  SEARCH  /  LOG IN  /  SIGN UP
JCEPM Vol.1 (2011)
Vol.1 No.1 (May 2011)
Vol.1 No.2 (Aug 2011)
Vol.1 No.3 (Dec 2011)
JCEPM Vol.2 (2012)
Vol.2 No.1 (Mar 2012)
Vol.2 No.2 (Jun 2012)
Vol.2 No.3 (Sep 2012)
Vol.2 No.4 (Dec 2012)
JCEPM Vol.3 (2013)
Vol.3 No.1 (Mar 2013)*
Vol.3 No.2 (Jun 2013)
Vol.3 No.3 (Sep 2013)*
Vol.3 No.4 (Dec 2013)
JCEPM Vol.4 (2014)
Vol.4 No.1 (Mar 2014)
Vol.4 No.2 (Jun 2014)
Vol.4 No.3 (Sep 2014)
Vol.4 No.4 (Dec 2014)
JCEPM Vol.5 (2015)
Vol.5 No.1 (Mar 2015)
Vol.5 No.2 (Jun 2015)
Vol.5 No.3 (Sep 2015)
Vol.5 No.4 (Dec 2015)*
JECPM Vol.6 (2016)
Vol.6 No.1 (Mar 2016)
Vol.6 No.2 (Jun 2016)
Vol.6 No.3 (Sep 2016)
Vol.6 No.4 (Dec 2016)
JECPM Vol.7 (2017)
Vol.7 No.1 (Mar 2017)
Vol.7 No.2 (Jun 2017)
Vol.7 No.3 (Sep 2017)
Vol.7 No.4 (Dec 2017)
JCEPM Vol.8 (2018)
Vol.8 No.1 (Mar 2018)
 Home > Publications > JCEPM Vol.2 (2012) > Vol.2 No.1 (Mar 2012)
Journal of Construction Engineering and Project Management
1. Journal of Construction Engineering and Project Management 2012/03/01 
2. Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics Recession 2012/03/01 
3. Factors Influencing Human Resource Planning (HRP) for Local Workforce Supply in Malaysian Construction Industry 2012/03/01 
4. Construction Based Model for Assessing Maturity Level of Enterprises 2012/03/01 
5. Development Framework of Interactive Electronic Technical Manual for Urban Regeneration 2012/03/01 
6. Infrastructure Component Assessment Using the Condition Index System: Literature Review and Discussion 2012/03/01 
7. Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer 2012/03/01 
Jump to:  
 


Room 1102, The Korea Science and Technology Center, New Building, 635-4, Yoksam, Kangnam, Seoul, Korea 135-703
Tel. +82-2-556-5184~6 / Fax. +82-2-556-2408 / E-mail. jcepm@kicem.or.kr
Supported by ONTOIN